01 — The brief
Graham Whitlock — Managing Director · Site engineer since 1994

Harbour Yard Residences, Canal Basin, Sheffield — 186 homes on a former boatyard between a listed canal wall and a live railway. Ninety-four weeks, two of them early.

Soft alluvium to eleven metres, a listed canal wall on one side and a live railway on the other.

Block A topped out in week 41, Block B in week 58 — a cross-laminated frame a third lighter than its concrete twin.

Practical completion two weeks ahead of programme, and 92% of site waste kept out of landfill.
Homes, offices, a listed works and a logistics hub. Scroll, and the rail moves.

186 homes · £42.8M · 94 weeks

128,000 ft² · £61.5M · BREEAM Outstanding

Grade II · £14.2M · EPC G to A

42 homes · £18.6M GDV · All-electric

410,000 ft² · £38.9M · 2.4 MWp solar
Roll 26 · Eight frames · North of England
Site, budget and ambition tested in four weeks.
Designers and builders price every stage together.
A guaranteed maximum price you can take to your board.
Logistics and trade packages locked down first.
Weekly progress and monthly cost reports.
A defects team for up to two years.
Graham WhitlockManaging Director
Priya RamanDesign Director
Tomasz KowalHead of Construction
Hannah BrierleyCommercial Director
Martin AshbyHealth, Safety & Quality Lead
Leah MorenoDevelopment Manager